Members of the 1437th Treadway Bridge CO, US 8th Army, erecting a floating bridge during the Korean Conflict on Route #3-D after the flooded roadbed washed out. Temporary bridge building was and is essential to military campaigns. When we think of combat, though, bridge building is not the first activity to come to mind. Nevertheless, without the capability, most campaigns would fail utterly. So it is with organizations undergoing dramatic change. They must take on responsibilities that they don't consider to be in the usual course of events, and they must construct policies and procedures that will not endure. These activities are necessary when we take on the challenge of organizational change. Photo taken July 8, 1952, courtesy U.S. Army Corps of Engineers.
In Part I of this exploration of the challenges of Change, we examined two sources of difficulty — sources internal (our emotions) and source external (outside pressures). This time, we explore issues related to planning. We'll look at three sets of reasons why planning change is so difficult: unexpected linkages, unexpected detours, and the need for temporary bridges.
- Unexpected linkages
- Linkages between organizational elements are often informal and unaccounted for. When an unrecognized linkage exists, changing one of the linked elements requires that we deal with the other linked elements.
- For example, when one group is physically situated close to another, friendships and associations form. Some of those connections might be channels for ongoing knowledge exchange. Separating the two groups by moving one group to a distant location can stress those connections, degrading performance. Relocating them both together might be preferable.
- If we break linkages we don't understand, change can be hard. A plan to move one group might seem perfectly sound, but it can fail if it doesn't recognize the importance of bonds between people. What might seem like resistance could actually be the result of interrupted knowledge flow due to breaking connections.
- Unexpected detours and backtracking
- At times, only after we begin executing a change plan do we recognize some factors we neglected. When this happens, with a little luck, we can make adjustments and continue. But sometimes we have to stop or backtrack, replan, and begin again.
- For example, in an acquisition, if we intend to relocate the acquired IT department, we might find that relocation is impractical because key people would require financial assistance with real estate issues. And keeping those people in place might also incur unsustainable costs. The department relocation plan wasn't defective, though it didn't anticipate real estate market conditions.
- If a plan is incomplete, change can be hard. The people involved might not be resisting change — they might actually have legitimate issues that the plan didn't anticipate.
- Temporary bridges
- When we At times, only after we begin
executing a change plan
do we recognize some
factors we neglectedencounter or anticipate difficulty, we might not be able to change systems directly from their current configurations to the final configurations we seek. Sometimes, we must build temporary bridges. - For example, in the IT relocation problem, the organization might become a lender, investor, or loan facilitator, to enable people who are relocated to secure mortgages for new homes.
- Plans that include interim configurations that we intend later to abandon aren't necessarily defective. And the people whose needs we're accommodating in this way aren't making trouble — they have legitimate needs that we must somehow address. Unless we can be flexible enough to find temporary bridges, change can be hard.
When change is hard, and when the job market is tight, some managers are tempted to communicate the change-or-else message. Resist the temptation. Someday, those who are unhappy will have alternatives. And they will choose them. First issue in this series
Top
Next Issue
Is your organization embroiled in Change? Are you managing a change effort that faces rampant cynicism, passive non-cooperation, or maybe even outright revolt? Read 101 Tips for Managing Change to learn how to survive, how to plan and how to execute change efforts to inspire real, passionate support. Order Now!
Your comments are welcome
Would you like to see your comments posted here? rbrenjTnUayrCbSnnEcYfner@ChacdcYpBKAaMJgMalFXoCanyon.comSend me your comments by email, or by Web form.About Point Lookout
Thank you for reading this article. I hope you enjoyed it and
found it useful, and that you'll consider recommending it to a friend.
This article in its entirety was written by a human being. No machine intelligence was involved in any way.
Point Lookout is a free weekly email newsletter. Browse the archive of past issues. Subscribe for free.
Support Point Lookout by joining the Friends of Point Lookout, as an individual or as an organization.
Do you face a complex interpersonal situation? Send it in, anonymously if you like, and I'll give you my two cents.
Related articles
More articles on Workplace Politics:
How Pet Projects Get Resources: Abuse
- Pet projects thrive in many organizations — even those that are supposedly "lean and mean."
Some nurturers of pet projects abuse their authority to secure resources for their pets. How does this happen?
The Deck Chairs of the <em>Titanic</em>: Obvious Waste
- Among the most futile and irrelevant actions ever taken in crisis is rearranging the deck chairs of
the Titanic, which, of course, never actually happened. But in the workplace, we engage in
activities just as futile and irrelevant, often outside our awareness. Recognition is the first step
to prevention.
Impasses in Group Decision Making: I
- Groups sometimes find that although they cannot agree on the issue at hand in its entirety, they can
agree on some parts of it. Yet, they remain stuck, unable to reach a narrow agreement before moving
on to the more thorny areas. Why does this happen?
The End-to-End Cost of Meetings: II
- Few of us realize where all the costs of meetings really are. Some of the most significant cost sources
are outside the meeting room. Here's Part II of our exploration of meeting costs.
The End-to-End Cost of Meetings: III
- Many complain about attending meetings. Certainly meetings can be maddening affairs, and they also cost
way more than most of us appreciate. Understanding how much we spend on meetings might help us get control
of them. Here's Part III of a survey of some less-appreciated costs.
See also Workplace Politics and Workplace Politics for more related articles.
Forthcoming issues of Point Lookout
Coming February 26: Devious Political Tactics: Bad Decisions
- When workplace politics influences the exchanges that lead to important organizational decisions, we sometimes make decisions for reasons other than the best interests of the organization. Recognizing these tactics can limit the risk of bad decisions. Available here and by RSS on February 26.
And on March 5: On Begging the Question
- Some of our most expensive wrong decisions have come about because we've tricked ourselves as we debated our options. The tricks sometimes arise from rhetorical fallacies that tangle our thinking. One of the trickiest is called Begging the Question. Available here and by RSS on March 5.
Coaching services
I offer email and telephone coaching at both corporate and individual rates. Contact Rick for details at rbrenjTnUayrCbSnnEcYfner@ChacdcYpBKAaMJgMalFXoCanyon.com or (650) 787-6475, or toll-free in the continental US at (866) 378-5470.
Get the ebook!
Past issues of Point Lookout are available in six ebooks:
- Get 2001-2 in Geese Don't Land on Twigs (PDF, )
- Get 2003-4 in Why Dogs Wag (PDF, )
- Get 2005-6 in Loopy Things We Do (PDF, )
- Get 2007-8 in Things We Believe That Maybe Aren't So True (PDF, )
- Get 2009-10 in The Questions Not Asked (PDF, )
- Get all of the first twelve years (2001-2012) in The Collected Issues of Point Lookout (PDF, )
Are you a writer, editor or publisher on deadline? Are you looking for an article that will get people talking and get compliments flying your way? You can have 500-1000 words in your inbox in one hour. License any article from this Web site. More info
Follow Rick





Recommend this issue to a friend
Send an email message to a friend
rbrenjTnUayrCbSnnEcYfner@ChacdcYpBKAaMJgMalFXoCanyon.comSend a message to Rick
A Tip A Day feed
Point Lookout weekly feed