Example of an unsecured driver-side floor mat trapping the accelerator pedal in a 2007 Toyota Lexus ES350. We don't yet know much about the root cause of quality problems in recent models of vehicles designed and manufactured by Toyota, but we can already evaluate the company's public response to the reports of problems. Briefly, their response has been erratic. In part, this might be due to the company's inexperience with defects. Their record has been so good, and recalls so few, that they might have had an organizational blind spot relating to the risk of public exposure of defects in their products. Undoubtedly, this blind spot is now being corrected, albeit in a manner most unpleasant for all concerned. Photo courtesy U.S. National Highway Traffic Safety Administration.
Risk plans are rarely perfect. For complex projects, unanticipated risk will almost certainly materialize. We can deal with this risk — I'll call it risk management risk — if we adopt some simple practices. Let's begin with some examples of organizational and political risks.
- Organizational blind spots
- Organizational risk management asset bases usually consist of previously developed risk plans and risk plan elements, documented risk plan development procedures, and personal experiences.
- Although referring to these assets might uncover risks that any particular risk manager might not otherwise consider, relying on the asset base probably won't uncover risks not included there. Since continuous organizational change almost certainly exposes the organization to risks never before seen, these asset bases have blind spots.
- To limit these blind spots, analyze the results of retrospectives to determine what risks were unanticipated. They provide clues to the location of the organization's blind spots.
- Organizational political correctness
- In general discourse, political correctness requires that we shape our statements and behavior — if not our opinions — to conform to a generally accepted ideological standard. Organizational political correctness provides an analogous constraint relative to the ideology and views of the organization.
- Organizational Organizational political correctness
can limit the ability of risk managers
to address significant riskspolitical correctness can limit the ability of risk managers to address significant risks, when even discussing such risks calls into question organizational beliefs, or the beliefs of those who have internal political power. - If a common theme appears among unanticipated risks, if those risks are evident to many, and if the same risks materialize across many projects, organizational political correctness could be a cause. Organizational culture change is required to address this risk.
- Political risk
- The organizational value of any project is determined, in part, by the political clout of its advocates. How an organization values a project can present risks to it through resource allocation, schedule, and budget.
- Although these risks are widely understood, talking about them openly and planning for them in writing is often difficult, for reasons far beyond organizational political correctness. For the politically weak project, committing to writing and review any plan to deal with political risks simply provides a roadmap to rival projects if they are politically stronger. Such a risk plan is often effectively countered before it can be implemented. In some cases, it might even be forbidden. This effect is especially pronounced if a state of toxic conflict persists between the departments, leaders, or champions of the two projects.
- Two factors suggest the presence of political risk. First is the absence of any explicit mention of political risk from the risk plans of politically weak projects. A second indicator can be changes in the execution plan of politically stronger projects, especially following publication of the risk plan of a politically weaker project.
In Part II, we'll examine risk dynamics and risk interactions. Next issue in this series
Top
Next Issue
Is every other day a tense, anxious, angry misery as you watch people around you, who couldn't even think their way through a game of Jacks, win at workplace politics and steal the credit and glory for just about everyone's best work including yours? Read 303 Secrets of Workplace Politics, filled with tips and techniques for succeeding in workplace politics. More info
Your comments are welcome
Would you like to see your comments posted here? rbrenjTnUayrCbSnnEcYfner@ChacdcYpBKAaMJgMalFXoCanyon.comSend me your comments by email, or by Web form.About Point Lookout
Thank you for reading this article. I hope you enjoyed it and
found it useful, and that you'll consider recommending it to a friend.
This article in its entirety was written by a human being. No machine intelligence was involved in any way.
Point Lookout is a free weekly email newsletter. Browse the archive of past issues. Subscribe for free.
Support Point Lookout by joining the Friends of Point Lookout, as an individual or as an organization.
Do you face a complex interpersonal situation? Send it in, anonymously if you like, and I'll give you my two cents.
Related articles
More articles on Project Management:
The Triangulation Zone
- When somebody complains to you about someone else's performance, you're entering into another dimension
— a dimension of three minds. That's the signpost up ahead — your next stop, the Triangulation
Zone.
Down in the Weeds: I
- When someone says, "I think we're down in the weeds," a common meaning is that we're focusing
on inappropriate — and possibly irrelevant — details. How does this happen and what can
we do about it?
Missing the Obvious: I
- At times, when the unexpected occurs, we recognize with hindsight that the unexpected could have been
expected. How do we miss the obvious? What's happening when we do?
An Introduction to Workplace Ostracism
- We say that a person has been ostracized from a group when that person is ignored by the members of
that group or excluded from participating in that group's activities, and when we might otherwise expect
that person to be a member. Workplace ostracism can have expensive consequences for the enterprise.
Seven Planning Pitfalls: II
- Plans are well known for working out differently from what we intended. Sometimes, the unintended outcome
is due to external factors over which the planning team has little control. Two examples are priming
effects and widely held but inapplicable beliefs.
See also Project Management and Project Management for more related articles.
Forthcoming issues of Point Lookout
Coming February 26: Devious Political Tactics: Bad Decisions
- When workplace politics influences the exchanges that lead to important organizational decisions, we sometimes make decisions for reasons other than the best interests of the organization. Recognizing these tactics can limit the risk of bad decisions. Available here and by RSS on February 26.
And on March 5: On Begging the Question
- Some of our most expensive wrong decisions have come about because we've tricked ourselves as we debated our options. The tricks sometimes arise from rhetorical fallacies that tangle our thinking. One of the trickiest is called Begging the Question. Available here and by RSS on March 5.
Coaching services
I offer email and telephone coaching at both corporate and individual rates. Contact Rick for details at rbrenjTnUayrCbSnnEcYfner@ChacdcYpBKAaMJgMalFXoCanyon.com or (650) 787-6475, or toll-free in the continental US at (866) 378-5470.
Get the ebook!
Past issues of Point Lookout are available in six ebooks:
- Get 2001-2 in Geese Don't Land on Twigs (PDF, )
- Get 2003-4 in Why Dogs Wag (PDF, )
- Get 2005-6 in Loopy Things We Do (PDF, )
- Get 2007-8 in Things We Believe That Maybe Aren't So True (PDF, )
- Get 2009-10 in The Questions Not Asked (PDF, )
- Get all of the first twelve years (2001-2012) in The Collected Issues of Point Lookout (PDF, )
Are you a writer, editor or publisher on deadline? Are you looking for an article that will get people talking and get compliments flying your way? You can have 500-1000 words in your inbox in one hour. License any article from this Web site. More info
Follow Rick





Recommend this issue to a friend
Send an email message to a friend
rbrenjTnUayrCbSnnEcYfner@ChacdcYpBKAaMJgMalFXoCanyon.comSend a message to Rick
A Tip A Day feed
Point Lookout weekly feed